Summary of Contents for 360 Yield 360 Y-DROP JOHN DEERE 4720
Page 1
INSTRUCTIONS 360 Y-DROP ® JOHN DEERE 4720 360 Y-DROP REGISTRATION ® Please visit productregistration.360yieldcenter.com to complete the product registration for your 360 Y-DROP so we can better support our products from day one and ensure you have the latest upgrades, warranty parts and technical support. Thank you! 360YIELDCENTER.COM V1 - 01.25.2017...
Page 2
INSTRUCTIONS 360 Y-DROP JOHN DEERE 4720 INTRODUCTION Before beginning, it’s important to know where each mounting bracket fits relative to the row spacing involved. The 360 Y-DROP unit should be precisely centered on the machine, as this is critical to the assembly of the system to the sprayer and for mounting the system to your sprayer boom.
INSTRUCTIONS 360 Y-DROP JOHN DEERE 4720 ESTABLISH DROP LOCATIONS Figures 1 and 2 Step 1 Locate the center of the machine and identify the location of all the drops. On the sprayer boom, mark where each riser mount will be located. This will ensure that the extension tubes will not interfere Figure 1 with the riser mounts.
Page 4
INSTRUCTIONS 360 Y-DROP JOHN DEERE 4720 INSTALL WET BOOM SPACER PLATE This process will create the clearance necessary for the new square tube and wet boom assembly. Figure 4 Step 1 Remove bolt assemblies (1). Figure 5 Step 2 Install two 4" spacer plates (1). Figure 4 From Center Section Kit Step 3...
INSTRUCTIONS 360 Y-DROP JOHN DEERE 4720 INSTALL SQUARE TUBE III. BRACKET ON OEM PRIMARY BOOM NOTE: The second mounting location requires special instructions. See pg. 6 for more information. Figure 6 Step 1 With the threads pointing down, install U-bolt (1) on front OEM boom. Install bracket assembly (2) and the nuts onto Figure 6 the front OEM boom.
Page 6
INSTRUCTIONS 360 Y-DROP JOHN DEERE 4720 SPECIAL INSTRUCTIONS FOR SECOND III. MOUNTING LOCATION NOTE: Below are the special mounting instructions for the second mounting location on each primary boom. Figure 8 Step 1 With the threads pointing down, install U-bolt (1) on front OEM boom. Install bracket assembly (2) and the nuts onto the front OEM boom.
INSTRUCTIONS 360 Y-DROP JOHN DEERE 4720 INSTALL 360 Y-DROP BOOM Figure 13 Step 1 Assemble 5' boom sections (1) utilizing 8" boom connectors (2) and the supplied hardware. Hardware Bag CC Step 2 Repeat Step 1 as needed in order to Figure 13 assemble the entire 360 Y-DROP boom.
INSTRUCTIONS 360 Y-DROP JOHN DEERE 4720 INSTALL BREAKAWAY ASSEMBLY - ONE PIECE Figure 17 Step 1 Install breakaway assembly - one piece (1) using the square U-bolts (2) and the extra thick washer and Nylock nut. Repeat for the remaining breakaway assemblies - one piece.
INSTRUCTIONS 360 Y-DROP JOHN DEERE 4720 INSTALL RISER MOUNTS WITHOUT BREAKAWAY ASSEMBLIES (OPTIONAL) Figure 20 Step 1 Install riser mount (1) using the square U-bolts (2) and the extra thick washer and Nylock nut. Repeat for the remaining riser mounts. Hardware Kit C Figure 20 Figure 21...
Page 11
INSTRUCTIONS 360 Y-DROP JOHN DEERE 4720 INSTALL SHIELDS AND VII. RISER HOSES Figure 23 Step 1 Install shield (1) onto riser tube (2). Figure 24 Step 2 Install base unit (1) onto riser tube (2). Figure 25 Step 3 Assemble drag hoses (1) to 360 Y-DROP Figure 23 base and secure with hose clamps (2).