Fetco CBS-51H10 User Manual page 10

Cbs-5000 series coffee brewers
Hide thumbs Also See for CBS-51H10:
Table of Contents

Advertisement

Mechanical Illustration - Dispense System
DISPENSE LATCH ASSEMBLY:
SOLENOID ASSY, PUSH ROD, MICROSWITCH,
SOLENOID LATCH PLATE ASSY
BREW START/STOP HANDLE
CONTROL PANEL
BREW
FRONT VIEW
DRIVE SCREW
BREW START/STOP
HANDLE RETURN
SPRING
STOP
BREW BASKET
DISPENSE TUBE
SPRAY HEAD
DISPENSE TUBE SHAFT
TEFLON SEAL
DISPENSE FITTING ASSY:
DISPENSE FITTING
DISPENSE FITTING LOCKNUT
SEAL LOCKNUT
BY-PASS TUBE
DISPENSE TUBE
BY-PASS VALVE
SPRAY HEAD
SIDE (SECTION) VIEW
TEFLON SEAL
SEAL LOCKNUT
10
SEAL
WATER LEVEL PROBE
FLOW DISC
SPRAY CUTTER
LOCKNUT
To remove the dispense tube:
1. Unscrew seal locknut and
release the drive screw from
dispense tube shaft.
2. Turn the dispense tube
slightly back and forth, while
pushing the tube into the hot
water tank until it is free from
the sprayhead.
Pull the dispense tube out of
the tank. Remember the tube
is bent inside the tank. The
seal will come out with the
tube.
To install the dispense tube:
1. Clean any lime build up off
the tube and then slide the seal
off. Push the seal carefully
into its chamber in the
fitting.(spring towards the hot
water tank.)
2. Place the seal locknut onto
the tube and slide the tube into
the seal. Tighten the seal
locknut.
3. Work the tube back into
the sprayhead seal.
4. Join the dispense tube
shaft and the brew handle
shaft with the drive screw.
HOT WATER TANK

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cbs-52h15Cbs-51h15Cbs-52h20

Table of Contents