Installing The Ccl001Z1 - Toshiba TOSVERT VF-AS1 Instruction Manual

Cc-link ccl001z1
Hide thumbs Also See for TOSVERT VF-AS1:
Table of Contents

Advertisement

3. Installing the CCL001Z1

Turn off input power of VF-AS1/PS1 and wait for at least 15 minutes and then check
Mandatory
that the CHARGE lamp on VF-AS1/PS1 is no longer lit.
Install the CC-Link option to VF-AS1/PS1 as follows.
*1 When this option is used together with the I/O card option, attach this option to the front panel
side.
(1) Check that all the power supplies to an inverter are turned off.
Securing the option to the inverter
(2)
(A) For VFAS1/VFPS1 200V 45kW or less, 400V 75kW or less
a) Insert a flat-blade screwdriver in each of the two holes at the upper part of the front
b) Install the option in the inverter by fitting the tabs on the lower side the option into
c) Make sure the option is securely attached to the inverter. Then check whether the
d) Insert the tabs at the lower part of the front cover into the slots at the lower part of
e) Stuck the enclosed "LED name label" in the option LED display part of a front
a-1)
b)
LED name label
POWER
L.RUN
SD
RD
L.ERR
panel, release the panel mounting tab by pushing the screwdriver down and
remove the front panel cover.
the slots at the lower part of the inverter front panel.*2
plastic bosses on the inverter case have fitted in the holes at the upper and lower
parts of the option.
the inverter to attach the front cover to the inverter.*2
cover.
c)
e)
- 9 -
a-2)
Connecter pins
*2 Do not bend the connector pins when
you install the option card and panel.
E6581476②
a-3)
Connecter pins