Download Print this page

Installation - Anzzi PURE SP-AZ021 Install Manual

Advertisement

INSTALLATION (SETUP)
Figure A
IMPORTANT
Before drilling any holes for the shower panel brackets, ensure there are no hidden cables or
pipelines aligned with the desired drilling position.
Step A
Drill the two holes for the top bracket 1" apart at the desired height.
Step A.2
Drill the two holes for the bottom bracket 1" apart at approximately 45" below the top bracket.
PERFECTION IS OUR TRADITION™
pg. 4

Advertisement

loading
Need help?

Need help?

Do you have a question about the PURE SP-AZ021 and is the answer not in the manual?

Questions and answers