CHAPTER 6 – ELECTRICAL INSTALLATION
Preparing cables for cable entries with cable
—
References
glands
—
•
On the length of cable which passes through
6-12 Preparing control
cables for cable glands
the conductive part of the cable gland, remove
the outer cable sheath to bring the conductive
foil of the sealing module
cable shield (3).
1
2
—
6-12
(2)
in contact with the
3
4
5
Outer cable sheath
1
Cable gland
2
Conductor insulation removed to expose cable shield
3
Plate
4
Conductor screen extension to be connected to PE ter-
5
minal
106