Page 1
Assembly Procedure 1.) Unpack contents of shipping carton and compare to inventory list above. 2.) Place the #F24 floor, flat side down, on your floor. Make sure the #F24 floor is resting completely flat on your floor surface. 3.) Place your existing Roverpet dog cage over the floor, with the flat side facing down. The Roverpet dog cage will rest on the outside of the #F24 floor frame.
Page 2
5.) For multi-floor pet crates: Install (4) #250 floor clips over the #F24 floor frames where they meet together. Place (2) #250 floor clip at the furthest most points of the #F24 frames and (2) more #250 floor clips evenly spaced across the two #F24 floor frames.
Need help?
Do you have a question about the F24 and is the answer not in the manual?
Questions and answers