1
Hardware Setup
2
Software Setup
Appendix A
Synthesizing Desired Frequencies
Appendix B
Output Configuration Options
Appendix C
TRF3762 QFN Installation Using a Hakko Hot Air Rework Station
1
Single Output Without Balun
1
Required Test Hardware
1
Hardware Setup
This manual can help users to operate the TRF3762 evaluation module (EVM) with the supplied software.
The required hardware for testing the EVM is listed in
Hardware
Power supply (1)
Spectrum analyzer (1)
Agilent's 5052 (1)
Low phase noise reference source (1)
Personal computer (PC) (1)
Power cable (1)
Parallel-to-parallel connector cable(1)
Coaxial cable (2)
X-ACTO is a trademark of Elmer's Products, Inc..
LabVIEW is a trademark of National Instruments Corporation.
SLWU056 – June 2008
Submit Documentation Feedback
..............................................................................................................
...............................................................................................................
.............................................................................
...................................................................................
..............................................................................................
....................................................................................................
Table 1. Required Test Hardware
Rms jitter
2-GHz processor, CD drive, Parallel port
TRF3762 EVM User's Guide
Contents
List of Figures
List of Tables
Table
1.
Specifications
4.5 to 5.2
0 to 6 Spurs
–160 resolution (phase noise)
1 kHz
–120.22
100 kHz
–145.6
590 kHz
–158
1 MHz
–158
3 MHz
–160
5 MHz
–161
236.69
Supplied by Texas Instruments
Not supplied by Texas Instruments
50
User's Guide
SLWU056 – June 2008
........................................
Units
V
GHz
dBm
dBc
ps
DB25 to DB25
TRF3762 EVM User's Guide
1
2
10
11
12
2
1
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the TRF3762 EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TRF3762 EVM

  • Page 1 User's Guide SLWU056 – June 2008 TRF3762 EVM User's Guide Contents ......................Hardware Setup ....................... Software Setup ................Appendix A Synthesizing Desired Frequencies ................... Appendix B Output Configuration Options ........Appendix C TRF3762 QFN Installation Using a Hakko Hot Air Rework Station List of Figures ....................
  • Page 2 • Programming cable Software Setup The LabVIEW™ software provided by Texas Instruments on the accompanying CD is the software that configures the TRF3762. It is used to set the registers inside the device for normal operation. The LabVIEW software interfaces to the EVM via a DB25 connector. The chip uses a SPI interface protocol with data formatted as little endian, which means the LSB is clocked in first.
  • Page 3 In either case, find the installer folder. This is the folder containing the program and its support files. Once found, open the installer folder, and the following screen displays. SLWU056 – June 2008 TRF3762 EVM User's Guide Submit Documentation Feedback...
  • Page 4 Once the folder installer has been copied on the computer, open it and find the LabVIEW runtime engine setup.exe file. Double-click it ,and execute the program by following the on-screen prompts. TRF3762 EVM User's Guide SLWU056 – June 2008 Submit Documentation Feedback...
  • Page 5 Open the accessHW.zip file. This file contains the software to set up the port on the PC. Extract all files in the zip folder to the folder you created (accessHW). The files should look like the following. SLWU056 – June 2008 TRF3762 EVM User's Guide Submit Documentation Feedback...
  • Page 6 Select Microsoft Visual C++ 2x, 4x, and then click Next. Follow the prompts. Once the program is installed, open it and you should see the following display. TRF3762 EVM User's Guide SLWU056 – June 2008 Submit Documentation Feedback...
  • Page 7 Software Setup www.ti.com This is the main control screen to use for programming the TRF3762; the frequency of interest is under the tab labeled Top Level App. SLWU056 – June 2008 TRF3762 EVM User's Guide Submit Documentation Feedback...
  • Page 8 • To enter the data into the TRF3762, press the Execute button. Once pressed, the output changes to the frequency shown in the Selected Output window. TRF3762 EVM User's Guide SLWU056 – June 2008 Submit Documentation Feedback...
  • Page 9 • Spur offset is the offset of the phase frequency detector spur. • Icp (Rbias) is the actual current of the charge pump. Calculated from [Icp(4.75k)]/Rbias = Icp actual SLWU056 – June 2008 TRF3762 EVM User's Guide Submit Documentation Feedback...
  • Page 10 Appendix A www.ti.com Appendix A Synthesizing Desired Frequencies Prescalar Div is a multiselection dual modulus to limit the frequency of the Prescalar to below 250 MHz. The setting are 8/9, 6/17, 32/33, and 64/65. The TRF3762 has an integer-N PLL synthesizer, and because of its flexibility (14-bit R, 6-bit A, 13-bit B counter, and dual modulus prescalar), is ideal for synthesizing virtually any desired frequency.
  • Page 11 Appendix B www.ti.com Appendix B Output Configuration Options Single/Differential Output Configurations Load Pout Single-ended Differential 50-Ω shunt Resistive Single-ended Differential 50-Ω shunt Tuned (LC) Differential External balun Resistive Differential External balun Tuned (LC) SLWU056 – June 2008 Output Configuration Options Submit Documentation Feedback...
  • Page 12 Appendix C www.ti.com Appendix C TRF3762 QFN Installation Using a Hakko Hot Air Rework Station The TRF3762 devices are optionally sampled separately from the board (TRF3671EVM-X). This guideline is designed to help the person evaluating these parts to install the sample device on the board provided. The EVM board has an immersion gold plating.
  • Page 13 EVALUATION BOARD/KIT IMPORTANT NOTICE Texas Instruments (TI) provides the enclosed product(s) under the following conditions: This evaluation board/kit is intended for use for ENGINEERING DEVELOPMENT, DEMONSTRATION, OR EVALUATION PURPOSES ONLY and is not considered by TI to be a finished end-product fit for general consumer use. Persons handling the product(s) must have electronics training and observe good engineering practice standards.
  • Page 14 IMPORTANT NOTICE Texas Instruments Incorporated and its subsidiaries (TI) reserve the right to make corrections, modifications, enhancements, improvements, and other changes to its products and services at any time and to discontinue any product or service without notice. Customers should obtain the latest relevant information before placing orders and should verify that such information is current and complete.