ADJUSTABLE SHEAVE
Drive
No.
OEM Part
Supplier No.
1
1VP71x1-3/8
100239-06
2
1VP71x1-1/8
100239-06
3
1VP65x1-3/8
78M7101
4
1VP60x1-3/8
78L5501
5
1VP56x1-1/8
P-8-1492
6
1VP60x1-1/8
41C1301
7
1VP50x1-1/8
P-8-1977
8
1VP44x1-1/8
36C0701
9
1VP44x1-1/8
36C0701
Cooling Start-Up
IMPORTANT-The crankcase heater must be energized for
24 hours before attempting to start compressor. Set
thermostat so there is no demand to prevent compressors
from cycling.
VFD Units - The blower rotation will always be correct on
VFD units. Checking blower rotation is not a valid method
of determining voltage phasing for incoming power.
IMPORTANT
Three Phase Scroll Compressor Voltage Phasing
Three phase scroll compressors must be phased se
quentially to ensure correct compressor and blower*
rotation and operation. Compressor and blower are
wired in phase at the factory. Power wires are color-
coded as follows: line 1-red, line 2-yellow, line 3-blue.
1-Observe suction and discharge pressures and blow
er* rotation on unit start-up.
2-Suction pressure must drop, discharge pressure must
rise and blower* rotation must match rotation marking.
If pressure differential is not observed or blower* rota
tion is not correct:
3-Disconnect all remote electrical power supplies.
4-Reverse any two field-installed wires connected to
the line side of S48 disconnect or TB13 terminal strip.
Do not reverse wires at blower contactor.
5-Make sure the connections are tight.
Discharge and suction pressures should operate at
their normal start‐up ranges.
*Supply air VFD motors should rotate in the correct di
rection; verify scroll compressor rotation separately.
Contact technical support if the VFD blower is rotating
incorrectly.
MANUFACTURER'S NUMBERS (60 HZ)
FIXED SHEAVE
Supplier
OEM Part
No.
No.
No.
BK140H
100788-13
BK120H
100788-07
BK130H
100788-08
BK110H
100788-06
BK120H
100788-07
BK110H
100788-06
BK120H
100788-07
BK120H
100788-07
BK140H
100788-13
TABLE 4
DRIVE COMPONENTS
BELTS
BELTS W/ TENSIONER
Supplier
OEM Part
Supplier
No.
No.
No.
BX78
100245-44
BX77
BX75
31K9801
BX73
BX75
31K9801
BX74
BX71
31K9701
BX71
BX71
31K9701
BX71
BX70
31K9601
BX70
BX70
31K9601
BX70
BX70
31K9601
BX70
BX73
100245-41
BX72
VFD Units and Units Equipped With Optional Voltage
or Phase Detection - The Unit Controller checks the
incoming power during start-up. If the voltage or phase is
incorrect, the Unit Controller will display an alarm and the
unit will not start. Refer to the Unit Controller manual for
details.
A-Preliminary Checks
1- Make sure that unit is installed in accordance with the
installation instructions and applicable codes.
2- Inspect all electrical wiring, both field‐ and
factory‐installed, for loose connections. Tighten as
required.
3- Check to ensure that refrigerant lines do not rub against
the cabinet or against other refrigerant lines.
4- Check voltage at disconnect switch. Voltage must be
within range listed on nameplate. If not, consult
power company and have voltage condition
corrected before starting unit.
5- Make sure filters are in place before start‐up.
B-Start-Up
VFD Units - Refer to the Optional VFD Start-Up section.
1- Initiate first and second stage cooling demands
according to instructions provided with thermostat.
2- First-stage thermostat demand will energize
compressors 1 and 2. Second-stage thermostat
demand will energize compressors 3 and 4. On
units with an economizer, when outdoor air is
acceptable, a first-stage demand will energize the
economizer; a second-stage demand will energize
compressors 1 and 2.
3- Units contain four refrigerant circuits or systems.
Evaporator and condenser coil refrigerant circuits 1
and 2 make up stage 1 cooling. Evaporator and
condenser refrigerant circuits 3 and 4 make up stage
2 cooling. See figure 20 or 21.
Page 15
SPLIT BUSHING
OEM Part
Supplier No.
No.
100245-43
H - 1-7/16
100245-41
H - 1-7/16
100245-42
H - 1-7/16
31K9701
H - 1-7/16
31K9701
H - 1-7/16
31K9601
H - 1-7/16
31K9601
H - 1-7/16
31K9601
H - 1-7/16
100245-14
H - 1-7/16
OEM Part
No.
49M6201
49M6201
49M6201
49M6201
49M6201
49M6201
49M6201
49M6201
49M6201