INSTRUCTIONS FOR PRESSURE TEST GAUGE CONNECTION

SUPPLY PRESSURE
1. The installer will provide a 1/8" N.P.T. tapped plug, accessible for test gauge connection immediately
upstream of the gas supply connection to the heater.
OUTLET GAS PRESSURE CHECK AND ADJUSTMENTS WHITE-RODGERS GAS VALVES
Gauges that measure pressure in pounds per square inch are not accurate enough to measure or set the
manifold pressure. All measurements MUST BE made when the heater and all other gas burning equipment that
are connectied to the gas supply system are operating at maximum capacity. The combination gas valve is
factory set and should not need adjustment. If gas pressure adjustment is required, follow the instructions:
1.
Turn off all electrical power to the system to connect manometer hoses.
2.
Turn the pressure test screw (3/32" Hex) in the center of the boss not more than one turn counterclockwise.
Attach a 5/16" hose and manometer over the tapered outlet pressure boss on the valve (see Figures 1 and
2 below). If regulator needs to be adjusted, see instructions below.
TO ADJUST REGULATOR (single stage gas valves):
1. Turn on power and energize the main gas valve. Remove regulator cover screw (see Figure 1 below). Turn
regulator adjustment screw clockwise
pressure. Replace regulator cover screw and tighten securely.
DO NOT EXCEED THE PRESSURES SHOWN IN THE GAS PRESSURE TABLE.
2. After testing pressure and adjusting the regulator, turn off all electrical power to the system, remove
manometer hoses, turn outlet test screw (3/32" Hex) clockwise to seal pressure port. Tighten to 7 in lb
minimum. Turn on system power.
TO ADJUST REGULATOR (two stage gas valves):
1.
Turn on power and energize main gas valve solenoid. Do not energize the HI solenoid.
2.
Remove regulator cover screw from the low outlet pressure regulator (see Figure 2 below) and turn screw
clockwise
to increase pressure, or counterclockwise
cover screw and tighten securely.
3.
Energize main gas valve solenoid as well as the HI terminal.
4.
Remove regulator cover screw from the high outlet pressure regulator (see Figure 2 below) and turn screw
clockwise
to increase pressure, or counterclockwise
cover screw and tighten securely.
DO NOT EXCEED THE PRESSURES SHOWN IN THE GAS PRESSURE TABLE.
5.
After testing pressure and adjusting the regulator, turn off all electrical power to the system, remove
manometer hoses, turn outlet test screw (3/32" Hex) clockwise to seal pressure port. Tighten to 7 in-lb
minimum. Turn on system power.
to increase presure, or counterclockwise
to decrease pressure. Replace regulator
to decrease pressure. Replace regulator
-36-
to decrease
Form #43155010
Dec 2017

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents