Space-Ray LTU 160/100-N7 Installation And Operation Instructions Manual page 16

Infrared radiant tube heater
Table of Contents

Advertisement

7. Insert SJO cable through the strain relief bushing of the control box and connect to L1 and L2 of terminal
block. Refer also to the wiring diagram in Section16.0).
8. Reflectors should overlap 1" to 3" and must be secured by sliding speed clips on the reflector edges. One
speed clip is required for each side of the reflector.
9. Fasten the first reflector to the tube support/hanger bracket with (2) #10 sheet metal screws according to
Detail "A". Mount the sliding reflector clamps (#42769010) per Reflector Clamp Installation (Detail "B") on
all tube support/hanger brackets. Make sure the reflector can slide under the clamp during heater operation.
Form #43155010
Dec 2017
The reflector clamps MUST be installed per reflector clamp
installation detail which allows the reflector to slide under the
clamp during heater operation.
Do not relocate the tube support/hanger bracket at the control box end of
the heater. This will increase the weight on the emitter tube and can result
in premature tube failure; this will void manufacturer's warranty.
-15-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents