Installation Drawings; Vertical Pipes - VGE MultiMax Pro Installation & User Manual

Uv-c sterilizer
Table of Contents

Advertisement

6.3 Installation drawings

The VGE Pro MP systems can be mounted in both horizontal and vertical pipes. When mounting, however,
care must be taken that the UV lamp(s) are always placed horizontally. Below are some examples of how
the UV system can be installed.
The UV systems can be flowed through in both directions, the lamp holder must be mounted depending on
the flow direction. There is an arrow on the lamp base that must correspond to the flow direction and
because the lamp can only be placed in the lamp holder in one way, it is important to position it correctly.
With correct installation, the arrow on the lamp base points in the direction of the flow and in the direction of
the cable gland of the lamp holder.
The cable gland in the lamp holder must therefore be mounted with the flow direction, see the examples
below.

6.3.1 Vertical pipes

The VGE Pro MultiMax systems are preferably be installed in a vertical pipe. The recommended flow
direction is upwards, as a result of which air is forced out of the irradiation chamber. With downward flow,
there is a risk that air will remain in the irradiation chamber if the back pressure is too low. Note the
direction of flow of the water and the position of the lamp holder (cable gland). With correct lamp holder
mounting, the arrow points to the lamp base in the direction of the flow.
Correct vertical assembly.
VGEM000-GB192
Pag. 38/68
VGE International B.V.
Ekkersrijt 4304
Installation & User Manual
Incorrect vertical mounting, the lamp is not placed
horizontally.
 +31 499 461099
5692 DH Son Netherlands
info@vgebv.nl
www.vgebv.nl

Advertisement

Table of Contents
loading

This manual is also suitable for:

935mm0400

Table of Contents