Viessmann VITODENS 100-W Manual page 50

Table of Contents

Advertisement

Montageablauf
Commissioning and testing
Adjusting the boiler water temperature
The boiler water temperature must be set at an adequate level to satisfy the
requirements of the heating system.
Final checks
1. If a time switch has been built into
the control unit:
Set required activation periods as
per the time switch operating
instructions.
Time switch operating
instructions
User´s instructions
Upon completion of commissioning
and testing, hand the appliance over
to the user, with reference to the follo-
wing.
Give the users instructions to the
responsible person for the property
and emphasise their responsibilities
under the current edition of the Gas
Safety (Installation and Use) Regu-
lations.
Explain and demonstrate the ligh-
ting and shutdown procedures.
50
(Fortsetzung)
Selecting the boiler water tempera-
ture:
Set rotary selector tr to the desired
DHW temperature.
2. Fill in the relevant details for the
installation in the benchmark log-
book supplied in the instructions
pack and affix the self adhesive bar
code strip from the outside of the
boiler packaging to this logbook.
Advise the householder on the effi-
cient use of the system, including
the use and adjustment of all sys-
tem controls for both DHW and CH.
Advise the user of the precautions
necessary to prevent damage to the
system and to the building in the
event of the system remaining
inoperative during frost conditions.

Advertisement

Table of Contents
loading

Table of Contents