Montagevorbereitung
Montagevorbereitung
3. Drill 710 mm holes and insert the
rawl plugs.
4. Cut flue pipe opening.
Preparing the connections
Hinweis
For dimensions for on-site preparations of the gas and water side connections
see Overall Appliance Dimensions on page 7.
1. Prepare the water connections.
2. Clean and flush the heating sys-
tem.
Use only the following cleansers:
Cleanser (Fernox)
Sentinal X300...
3. Prepare gas connection to BS
6891.
30
(Fortsetzung)
5. Fit wall mounting bracket with enc-
losed screws.
4. Prepare the electrical connections.
Mains cable: H05V2V2-F 3 G
1,0 mm
A 1.5m power cable is part of the
standard delivery.
Accessory cables: H05V2V2-F 3
G 1.0 mm
temperature control.
2
, 230 V~, 50 Hz.
2
for connection of room