Installation Check Sheet - Argo AWMI28AHL Installation Instructions Manual

Multi split system air conditioner
Hide thumbs Also See for AWMI28AHL:
Table of Contents

Advertisement

7. Installation Check Sheet

The strength of the installation location is sufficient
to support the A/C weight.
The indoor and outdoor units are installed level and
vertically.
The power and voltage are as specified.
Inter-unit cables are securely fastened to the termi-
nal board.
Inter-unit cables are securely fixed.
The power cord and inter-unit cables are not con-
nected anywhere along their paths.
The ground wire is securely connected.
An air purge of the refrigerant circuit has been con-
ducted.
A leak test of the tubing connections has been per-
formed.
Thermal insulation has been applied to the tubing
connections.
Drain connections are secure and water drains
properly.
Putty has been used to close the hole in the wall.
All service valves are fully open.
Remote controller signals are being positively
received.
22

Advertisement

Table of Contents
loading

This manual is also suitable for:

Awmi36ahlAwmi50ahlAwmi70ahlAe4mi91ah

Table of Contents