Balanced Body Legacy Reformer Manual

Balanced Body Legacy Reformer Manual

Advertisement

Quick Links

How to assemble your Legacy Reformer
Casters

IMPORTANT!

Inspect for Freight Damage

If you see any obvious crate damage, bring it to the attention of
the freight company driver immediately so that you can open it
in his presence to verify any possible damage to the contents.
This would include holes in the crate, damaged corners or any
evidence that the crate has been mishandled.

In case of freight damage

If there is freight damage, make certain you keep all packaging
material. Please call Balanced Body as soon as possible.

UNCRATING

Choose a convenient place where there is room to work all around
the crate. It is often easier to unpack the crate outside and move
the individual parts inside one at a time. Also, it is a good idea to
have a helper in the unpacking and moving of this equipment. It
can be both heavy and awkward to move.
Gently pry off the crate lid. Insert a pry bar or a flat screwdriver
under the plywood lid and gently push the tool downward to lift
the lid up. Work your way around the crate, prying and lifting until
the lid comes loose. It is a good idea to have your helper lift up
on a corner of the plywood as you pry along the sides. This allows
for easy entry of the ply tool; it also controls the lid when it comes
free.
Carriage
Remember, there are upholstered parts within, so go easy. The lid
will have exposed nails, so use care when handling it. Set the lid
aside with nails facing down to avoid accidentally stepping
on them.

LIFT THE FRAME OUT OF THE CRATE

Remove the protective cardboard layer. Remove the cardboard
box containing the upholstered sitting box. Inside the sitting
box you'll find the hardware and fittings needed to complete the
setup of your new Legacy Reformer.
Lift the frame from the crate. Remove the shipping screws or
straps that hold the carriage to the bottom of the crate. Lift
out the carriage and carefully set it aside. Inspect each item for
shipping damage. Wipe down all parts of the frame, carriage
and upholstery with a damp cloth. This is a good time to inspect
further for freight damage. Carry the frame to its permanent
location.

INSTALL THE CARRIAGE

Turn the carriage over and clean all the wheels of shipping dust,
etc. Clean the full length of the rail surfaces inside the frame.
Carefully place the carriage into the frame with the headrest
facing away from the footbar.
Footbar
Contact Us
1-800-PILATES | +1-916-388-2838
pilates.com | info@pilates.com
400-117 | 02.14.13

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Legacy Reformer and is the answer not in the manual?

Questions and answers

Summary of Contents for Balanced Body Legacy Reformer

  • Page 1 If there is freight damage, make certain you keep all packaging box you’ll find the hardware and fittings needed to complete the material. Please call Balanced Body as soon as possible. setup of your new Legacy Reformer. Lift the frame from the crate. Remove the shipping screws or UNCRATING straps that hold the carriage to the bottom of the crate.
  • Page 2 The wider INSTALL CARRIAGE BUMPER shoulder rest position is 1” wider than the narrower The Legacy Reformer includes a position. carriage bumper that determines the length of carriage movement If your equipment was ordered within the frame. This is easily...
  • Page 3 “click.” There are index markers along the rail that you can use as a visual reference. » Release the cam handle so that it drops completely into an indexed position. Proper Positioning of Foot Plate on the Legacy Reformer...
  • Page 4 Frequency will depend on use. » Slide the locks away from the footbar support. If you have any questions, please call Balanced Body at » Pull the footbar slightly upward and move the footbar support 1-800-PILATES (1-800-745-2837) or 916-388-2838.

Table of Contents