Common Mode Selection Jumpers - Texas Instruments ADS9110EVM-PDK User Manual

Table of Contents

Advertisement

www.ti.com
J1 Setting
J2 Setting
(R
Comp)
1
CLOSED
CLOSED
CLOSED
OPEN
CLOSED
OPEN
2.2.3
R
Setting vs Source Impedance
1
The external source impedance ( R
output common mode of the OPA625 amplifiers. To compensate for this, R
the particular external source impedance value used with the evaluation board to allow full-scale input
range without saturating the OPA625 amplifiers.
The board is shipped with R
Ω to 32 Ω for 0 V common mode configuration (J1:closed and J2:closed). For floating or AC-Coupled
signals, the input common mode is set by the OPA625 amplifiers themselves and R
kΩ for any given source impedance. The range of values of R
Equation
1.
7
2
6 .
10
u
9000

R
96

S
In the case of unipolar input signals, R
for any practical value of external source impedance (R
mode is determined using
8
1
9 .
10
u

R
1000

S
SBAU249 – October 2015
Submit Documentation Feedback
Figure 2. Common Mode Selection Jumpers
Table 3. J1 and J2 Configuration per Input Common Mode
External Signal
Common Mode
0 V
2.25 V
Floating
) will add up to the 1 kΩ of the input resistor, thereby moving the
S
as 280 kΩ that allows an external source impedance ( R
1
7
2
7 .
10
u
R
9000



1
R
67

S
must be replaced since 280 kΩ is not large enough to compensate
1
Equation
2.
8
2
8 .
10
u
177500
R


1
R
1000

S
Copyright © 2015, Texas Instruments Incorporated
Differential Source Type
Bipolar: If R1 = 280 kΩ, R
Unipolar: Must change R1 to match R
AC-Coupled Bipolar: If R1 = 280 kΩ, no R
for 0-V common mode is determined using
1
). The range of values of R
S
270000

Analog Interface
range is 0 Ω to 32 Ω
S
S
restriction
S
can be modified according to
1
) range between 0
S
should remain at 280
1
for 2.25-V common
1
ADS9110EVM-PDK
(1)
(2)
7

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ADS9110EVM-PDK and is the answer not in the manual?

Questions and answers

Table of Contents