Steps - commissioning, inspection and maintenance
Commissioning steps
Inspection steps
Maintenance steps
1. Note on commissioning, inspection and maintenance.................................................. 10
2. Checking the gas type....................................................................................................... 10
3. Converting to natural gas LL............................................................................................ 11
4. Commissioning the burner................................................................................................ 12
5. Reducing the maximum heating output (if necessary)................................................... 12
6. Checking static pressure and supply pressure.............................................................. 13
7. Checking the rotary damper setting................................................................................. 14
9. Checking the CO content.................................................................................................. 19
10. Checking the flue gas temperature.................................................................................. 20
11. Checking the ionisation current....................................................................................... 20
12. Shutting down the system................................................................................................. 20
13. Opening the boiler door..................................................................................................... 20
14. Checking the gaskets and thermal insulation sections................................................. 22
15. Checking the burner gauze assembly.............................................................................. 22
16. Checking the ignition electrodes and ionisation electrode........................................... 24
17. Closing the boiler door...................................................................................................... 24
18. Cleaning the burner........................................................................................................... 25
19. Fitting the fan...................................................................................................................... 25
20. Burner electrical connection............................................................................................. 26
21. Automatic tightness test on the two gas train valves.................................................... 26
22. Checking the gas train filter element............................................................................... 26
23. Checking the filter element in the gas line (if installed) and replacing if necessary
24. Checking all gas connections for tightness.................................................................... 27
25. Performing final checks..................................................................................................... 27
26. Mounting the burner hood................................................................................................. 27
27. Instructing the system user.............................................................................................. 28
content................................................................................................. 18
2
Commissioning, inspection, maintenance
Page
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Proflame vm iv

Table of Contents