Download Print this page

Anzzi SD-AZ056-01 Series Install & Operation Manual

Glass shower door

Advertisement

Quick Links

Advertisement

loading
Need help?

Need help?

Do you have a question about the SD-AZ056-01 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Anzzi SD-AZ056-01 Series

  • Page 4 Right-hand door installation shown Left-hand door installation shown...
  • Page 5 1.Wall Profile X2 2.Pivot Assembly X2 3.Rubber strip X2 4.Sweep Vinyl Seal X1 5.Hinge-Side Vinyl Seal X1 6.Magnetic Strike Vinyl X1 7.Door Glass X1 8.Decorative Washer X8 9.Pivot Bar X2 10.Vinyl Gasket (for Pivot Bar) X16 11.Truss Head Screw St5x40 X6 12.Wall Anchor X6 13.Hex Socket Bolt M8x20 X8 14.Hex Socket Bolt M8x10 X4...
  • Page 7 1. Make sure space is enough for the shwoer door ( 36*36 inch) 2. Place the side wall frofile (1) 20mm away from the edge of the shower base and use a horizontal ruler to make it perpendicular to the ground, and mark the position of the screw hole.
  • Page 8 3. mount the fixed glass (15) into the side wall profile (1), adjust it, and install it with the rubber strip(3). To mount the other fixed glass (15) on the other side with same installation way.Two fixed glass are installed. 4.
  • Page 9 5. Install the pivot (2) on the pivot bar with screws (14). Pay attention to the rotation direction of the pivot) inside inside 6. Install swing glass (7) on the pivot as shown...
  • Page 10 7. Install the handle (16) on the swing glass (7) as shown inside 8. As shown in the picture, install the Hinge Side Vinyl Seal (5) on the glass of the side near the pivot , and install the magnetic strip (6) on the other side of the glass. Install the bottom seal strip (4) on the bottom of the swing glass.
  • Page 11 After the installation, adhesive sealant on the outside of the product as shown, and it can only be used after 24 hours adhesive .