Mercia Garden Products 03TGCOR0707-V5 General Instructions Manual

Mercia Garden Products 03TGCOR0707-V5 General Instructions Manual

7x7 corner summerhouse
Hide thumbs Also See for 03TGCOR0707-V5:

Advertisement

Quick Links

General Instructions
03TGCOR0707-V5
7X7 CORNER SUMMERHOUSE
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screw-
driver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.

TIMBER

As with all natural materials, timber can be a ected during various weather conditions. For the duration of heavy or
extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during
excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be
helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine
and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent
the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-
ment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base dimensions,
The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap
the base, creating a run o for water. It is also recommended that the oor be at least 25mm above the surrounding
ground level to avoid ooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or
using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 03TGCOR0707-V5 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 03TGCOR0707-V5

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 03TGCOR0707-V5 Please retain product label and instructions for future reference Overall Dimensions: Length = 2084mm Width = 2084mm Door Handle QTY 2 Tower Bolt QTY 2 Butt hinge QTY 6 Turn Button QTY 2 Height = 2006mm 35mm Bolt x 4...
  • Page 3 Please retain product label and instructions for future reference Step 1 Pre Assembly Position press lock on the door Place oor on a rm and level align with key hole and x into base, ensure base has suitable position using 4 x 10mm screws. drainage free from areas where standing water can Then t barrel bolts to top and...
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 5 Place rear panel left against Place the front and rear panel the oor and the window frames onto the window panels side. and x in place using 3x50mm screws.
  • Page 5 Please retain product label and instructions for future reference Step 7 Step 9 Place the roof section on top of Cut three strips from roll of felt, the building, ensure the roof 2x3020mm and 1x1420mm in length. Felt Corner tacks framing slots over each side.
  • Page 6 Please retain product label and instructions for future reference Step 11 Step 13 Fix the fascias to the building Secure the front and rear roof over the felt and secure in framing to the underside of place with 17x40mm screws as the roof, xing in place using shown.
  • Page 7 Please retain product label and instructions for future reference Step 15 Fix the rear cover trims to the back of the building, aligning with the edge of the panel. 6x40mm Screws 40mm Pre drill screw It is ESSENTIAL that you apply wood treat- hole ment immediately after the building has been assembled.

Table of Contents