Pre-Installation
4.4.4
Flue terminal positions
CAUTION
Flue terminal positions
▶ All measurements are the minimum clearances required.
▶ Terminals must be positioned so to avoid combustion products
entering the building.
Vertical flue terminal positions
1
RIDGE VENT
RIDGE FLUE
1500
600
1500
BOUNDARY LINE
BOUNDARIES
1/2
1/2
Fig. 28 Vertical flue terminal positions
22
2
2
1500
8
1200
5
500
300
300
3
9
2
300
1500
600
7
400
300
10
1500
4
600
500
5
600
600
600
1500
2000
7
400
500
5
Greenstar 8000 Life – 6720883865 (2021/11)
6