Worcester Greenstar 8000 Life Installation And Maintenance Instructions Manual page 39

Gas fired condensing combi boiler
Hide thumbs Also See for Greenstar 8000 Life:
Table of Contents

Advertisement

CAUTION
Damage to boiler
Boiler may fall and/or not work properly.
▶ Make sure the boiler fits tightly the designtated grooves [1] in the
manifold.
1.
1
Fig. 47 Hanging the boiler
▶ Make connections between the boiler and the pre-plumbing manifold
and the pre-plumbing manifold and the system pipes.
▶ Connect the CH flow pipes to the boiler's 22mm compression
connections.
▶ Connect the CH return pipes to the boiler's 22mm compression
connections.
▶ Connect the gas supply to the boiler gas cock 22mm compression.
▶ Connect cold water in and DHW out to the boiler's 15mm
compression connectors.
▶ Connect the PRV discharge pipe to the heating pressure relief valve,
ensuring that it is tightened securely.
▶ Connect the condensate discharge pipe work to the boiler's
condensate outlet connections.
Fitting the drain pipe on the heating pressure relief valve
1.
Fig. 48 Fitting the pipe on the (heating) pressure relief valve
Greenstar 8000 Life – 6720883865 (2021/11)
2.
0010039208-001
2.
0010023577-003
Fig. 49 Discharge pipe to existing CDI classic position (not in the
hardware pack)
Fitting the condensate pipework
▶ Secure the pipe to the wall at the last joint.
▶ Ensure the pipe protrudes through the pre-plumbing manifold by
25mm.
▶ If exiting through the wall, to run externally, the pipe must have a 3°
fall and be increased to a 32mm insulated pipe.
25mm
Fig. 50 Fitting the condensate pipes to the mounting plate
Condensate connection
Never terminate or discharge into any open source, including; sink,
bath, shower, bidet, toilet etc.
Any external condensate pipe work of an excessive run should be
protected with weather resistant insulation to help prevent freezing
( chapter 4.5).
▶ Ensure that the condensate drain is 22mm diameter plastic pipe. It
must fall at least 52mm per metre towards the outlet.
Refer to Fig. 51, condensate connection:
▶ Align the installation side plastic pipe work through the pre-plumbing
manifold.
▶ Connect the installation side plastic pipe work to the end of the
condensate hose.
▶ Push the plastic pipe work inside the condensate hose at least
25mm.
Installation
9 0 °
7 0 m m
0010030270-001
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents