Step 7: Commissioning - Belling GG720LP Installation And User Instructions Manual

Gas built in oven
Table of Contents

Advertisement

Step 8: Commissioning
Pressure test point
Use the oven burner. From inside the
oven remove the burner cowl. Remove
the small screw at the LHS of the
burner cradle. Slide the burner to the
left to access the injector. Connect
manometer to the injector and turn the
grill burner to full on to check pressure.
Replace in reverse order.
Burner aeration
All burners have fixed aeration and no
adjustment is possible.
Pressure setting
G20 Natural Gas @ 20 mbar
G30 Butane @ 28-30 mbar
G31 Propane @ 37 mbar
Electrical systems check
In the event of an electrical fault the
preliminary electrical system check
(earth continuity, short circuit, polarity
and resistance to earth) must be
carried out.
Ignition
The manual ignition is operated by the
push button on the LHS of the facia
panel.
Installation Instructions
31
Oven
1. Push in and turn the control knob
anticlockwise to gas mark 9. The oven
light will come on automatically.
2. Continue to hold in the control
knob and press the ignition switch
until the burner lights. Do not hold
the control knob in for more than
15 seconds.
3. Check fan light and oven works.
Grill
1. Open the door, push in and turn
the control knob anticlockwise to
the full on setting.
2. Hold the control knob in and press
the ignition switch until the burner
lights. Do not hold the control
knob in for more than 15 seconds
3. Adjust to required setting.
4. Check condition of flame at low
setting.
5
Check fan works.
When you first turn on the oven or
grill you may notice a smell and some
smoke
which
comes
protective coating of oil burning off
from some of the parts.
Before leaving the installation
Show the customer how to ignite the
oven and grill, and give them this
handbook.
THANK YOU
from
the
.

Advertisement

Table of Contents
loading

Table of Contents