NEC N8100-1794F User Manual page 108

Table of Contents

Advertisement

Chapter 2 Preparations
4.
Because there are stoppers, the server will
come to a stop halfway. Press and hold Rail
Stopper on the rails and pull the server out
of the rack.
5.
Hold the server firmly and remove it from the rack.
(3)
Removing Outer Rail
Remove outer rails from the rack in the following procedure.
1.
Refer to Chapter 2 (2.1.2 Installing the server to the rack or removing it from the rack, (2) Removal
procedure) to remove the server from the rack.
2.
Push the unlock lever on outer rail to the
direction shown by arrow to house the slide
rail.
3.
While pressing the lever on outer rail, push
the outer rail toward inside of the rack, then
remove it.
108
Important
Be careful not to get your fingers caught in the rails or lever.
Important
• While more than one person is supporting the bottom part of the server,
slowly pull out the server.
• Do not apply pressure on the server from top when it is being pulled out.
Doing so cause the server to drop.
Express5800/R120d-1M User's Guide
2. Installation and Connection
Rail Stopper
レールストッパー
Unlock lever
Locking mechanism
ロック解除レバー
ロック機構

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800/r120d-1mNec express5800 series

Table of Contents