Actuator And Control Box Installation (perform ALL steps in numerical order):
1
IMPORTANT!
Weld or clamp pivot arm onto hinge post. For Pull-to-Open installation, use
Read entire
manual before
attempting the
TOP VIEW
installation.
This is NOT a
Hinge
"do-it-yourself"
Hinge
project. Use
Post
a qualified
contractor
to install this
system. Read
all safety
6"
information!
2
Attach Actuator
to Pivot Arm
Pivot Arm
4
Ensure actuator arm is fully retracted, then position gate
bracket on gate structural support per
A
Pull-To-Open:
Fully open gate,
then locate bracket
on gate support.
Wall
B
Push-To-Open:
Fully close gate, then
locate bracket on
gate support.
CAUTION! Do not mount the control box where the person
using the push button on box can come in contact with the gate!
With actuator release
7
open, set mechanical
limits by manually pushing
gate to desired close limit,
then to desired open limit,
then to halfway open posi-
tion. Close release, but do
not lock.
www.ApolloGateOpeners.com | (800) 878-7829 | Sales@ApolloGateOpeners.com
Mercury 310 / SolarBOX / TITAN 912L
Quick Start Installation Guide
A
Pull-to-Open
FRONT VIEW
Gate
Gate
Hinge
Post
Closed
1/2"
PULL
13"
Top of
Pivot Arm
CAUTION! Do NOT weld while control board is powered!
1/2"x 3.5" Bolt
Pivot Arm
Actuator
Install actuator
to pivot arm
2
with bolt and
lock nut as
shown.
Lock Nut
Ensure
Level
Fig-1: Pivot Arm, Actuator, & Gate Bracket Install
Detail A
or
Gate Open
Pull-To-Open
Gate Closed
Push-To-Open
Mount Control Box same
8
side as primary actuator
and minimum 6 feet away from
pivot arm (See Fig-2).
Place Battery inside con-
9
trol box with terminals
facing toward the front.
Or
Gate Bracket
Centerline
Hinge
Post
6"
Pivot
Arm
GATE
1/2"x 2-7/8"Bolt
1st Washer
Gate Bracket
Actuator Arm
Install gate bracket to
actuator arm, as shown
(w/ x2 washers, bolt, lock
nut). Do not attach brack-
et to gate until Step 5.
2nd Washer
Lock Nut
Gate
Bracket
912L Actuator
5
Detail
B:
Affix Gate
Bracket to
Bracket
gate struc-
tural support
by welding or
using bolt &
Bracket
nut.
Wire TITAN 912L
10
to control board:
Pass cable through
rubber grommets in
bottom of control box
and wire per diagram
at right.
For dual gate install, dig
trench across drive and
run 2nd actuator cable
through conduit.
Detail A.
For Push-to-Open, use
B
Push-To-Open
TOP VIEW
FRONT VIEW
Hinge
Gate
Hinge
Closed
PUSH
1/2"
11"
Top of
Pivot Arm
3
Attach Gate Bracket
to Actuator Arm
6
Open mechanical release on actuator.
1
2
Detail
B:
Gate
Gate Bracket
Centerline
Post
Pivot
Arm
3
1 1
Need help?
Do you have a question about the Mercury 310 and is the answer not in the manual?
Questions and answers