Description Of Cable Inlets - Ingecon SUN 125 U 208 Outdoor Installation Manual

Table of Contents

Advertisement

Ingeteam
After setting the AC thermomagnetic circuit breaker and DC circuit breaker to OFF, wait at least 10
minutes before opening the door. Internal capacitances may still hold hazardous voltages.
Once the equipment is open, check there is no electrical hazard in the voltage inputs from the grid,
the PV array or any auxiliary supply.
When checking that there is no voltage, wearing dielectric gloves and safety goggles approved for
electrical hazards is required.

5.5.1. Description of cable inlets

All power cables access the units through conduit located on the bottom of the cabinet.
As many conduits as necessary must be fitted, depending on installation requirements. To retain the unit's degree of
protection, the plugs should be replaced with conduit, leaving plugs wherever conduit is not going to be fitted.
Conduit should be 1 1/4 in and NEMA 4.
Care must be taken to ensure the equipment is not live when accessing its interior.
38
Grid connection thermomag-
netic circuit breaker
Bottom view of the unit
Panel circuit breaker
Installation manual
ABB2000IKI01

Advertisement

Table of Contents
loading

Table of Contents