11. Push Film Assist.
Note: This is only available after you select a profile
12. Pull the film and attach it to the load, pallet.
Step 6
6.8
Operate the Machine
1.
Reset the E-stop.
2.
Push Reset.
3.
Select a profile.
4.
Push Film Assist.
5.
Pull the film and attach it to the load.
6.
Push Start.
OPERATOR INSTRUCTIONS
66
Step 8
Need help?
Do you have a question about the QL-400 and is the answer not in the manual?
Questions and answers