Thread The Film - Lantech QL-400 Manual

Semi automatic stretch wrap machine
Table of Contents

Advertisement

WARNING
Obey all safety decal instructions and warnings.
6.7

Thread the Film

1. Push the E-stop.
2. Refer to the illustration below and make sure that the film roll is in the correct position.
1
Open the EZ Thread Gate
2
Thread the film between the Mast and the Top Guard and between the Rollers
3
Close the Gate
4
The Tackifier is on this Side
Thread the Film
The standard film roll is 254 mm (10") in diameter and 508 mm (20") in width.
1. Move the FDS up until Pallet Grip disengages.
2. Push the E-stop.
3. Look for damage on the film roll.
4. Put the film roll on the film post.
5. Release the latch on the EZ Thread gate.
6. Pull out 914 – 1219 mm (3' - 4') of film and twist it into a rope. (See illustration below)
7. Refer to the diagram and thread the film.
8. Close the gate. The film must be loose to make sure that it does not break.
9. Reset the E-stop.
10. Push Reset.
OPERATOR INSTRUCTIONS
65

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the QL-400 and is the answer not in the manual?

Questions and answers

Michael Konopka
May 16, 2025

We blew a fuse and are unable to identify for replacement. I can't find a fuse list for the unit. Can you provide one?

Table of Contents

Save PDF