Controller Initialization - Carrier XCT 7 40VCC727FQEE Operation & Installation Manual

Table of Contents

Advertisement

1 Controller initialization

The controller is powered on and starts automatically. After the hardware is started, it enters the software
loading interface. Please wait for the software loading to complete.
2、First login interface
To use the controller for the first time, a controller activation process is required. The controller activation
process is mainly used to set the initialization state of the controller
2.1 Language selection
① Currently supported languages are "Simplified Chinese", "English"
② Slide to select, the current highlighted as the selected system language, click "OK" to enter the next step.
This setting cannot be skipped.
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents