Advertisement

VTU
Technical Manual
BCU05
006
Version
BRUKER

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BCU05 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Bruker BCU05

  • Page 1 Technical Manual BCU05 Version BRUKER...
  • Page 2 The information in this manual may be altered without notice. BRUKER accepts no responsibility for actions taken as a result of use of this manual. BRUKER accepts no liability for any mis- takes contained in the manual, leading to coincidental damage, whether during installation or operation of the instrument.
  • Page 3: Table Of Contents

    Technical specifications ............. 19 Identification of parts ............20 Installation ................. 20 BCU05 HR to BCU05 HR-MAS ......23 How to change from BCU05HR to HR-MAS ....... 23 BCU05 HR-MAS to BCU05 HR ......25 How to change from BCU05HR-MAS to HR ....... 25 How to install a SENSE OF BEARING kit ......
  • Page 4 Contents 4 (41) BRUKER BCU05 Version 006...
  • Page 5: Index

    Index W3M151933......................31 W4D125211 A..................... 33 W4M123713 A ....................35 W4M123717 A ....................30 W4S125315 A ..................... 34 W4S125337 A ..................... 32 W4S22941 B ....................... 29 W4S23389 A ....................... 28 BCU05 Version 006 BRUKER 5 (41)
  • Page 6 Index 6 (41) BRUKER BCU05 Version 006...
  • Page 7: Bcu05 Hr Applications

    BCU05 HR applications This unit contains ozone friendly coolant R404A. The unit may however only be discarted by authorized personnel. BCU05 Version 006 BRUKER 7 (41)
  • Page 8: Technical Specifications

    ± 1°C under perfectly constant conditions of mains voltage, room temperature, air flow, etc. Operating principle The BCU05 is a cooling unit that reduces the temperature of an air input by typi- cally 65°C. Freon gas is circulating around an external heat exchanger. The system is com- pletely sealed.
  • Page 9: Identification Of Parts

    Identification of parts Identification of parts see "BCU05 with BST Block diagram" on page 28 • Mains breaker with power control light P/N 75370 • Heat exchanger • Heat exchanger support stand P/N W1208509 Following parts are supplied : •...
  • Page 10: Installation

    BCU05 HR applications Installation See "BCU05 with BST Block diagram" on page 28 To install the system, proceed as follows : 1. Attach the support clamp (supplied with magnet) to the magnet. Insert the two half shells between clamp and exchanger.
  • Page 11: Figure 1.2. Heat Exchanger (M151460A)

    Connect the air hose to the three way valve ex- haust. Figure 1.3. Glass ball joint (M151454B) 2. Take the heat exchanger support stand and position it between the magnet and the unit. Adjust the height. BCU05 Version 006 BRUKER 11 (41)
  • Page 12: Figure 1.4. Heat Exchanger Support Stand (M151454B)

    BCU05 HR applications Figure 1.4. Heat Exchanger support stand (M151454B) three way valve support stand heat exchanger main switch BCU 05 3. Position the cooling unit as far as possible from the magnet so as to minimise the effect of the magnet stray field.
  • Page 13: Figure 1.5. Bcu05 Connections

    If yes, decrease the air flow rate. Note: Please install the unit only on a hard floor. 6. If the BCU05 is controlled by a BVT3000/3300, connect the BVT plug to the connector called «BCU05» located on the BVT's front panel.
  • Page 14: Operating Notes

    BCU05 HR applications Operating notes 1. The BCU05 is be powered by the BVT3000/3300 and is designed for 24 hours a day operation as long as the probe is not exchanged. If the probe is to be ex- changed then switch off the unit and wait for 10 minutes before handling. The exchanger tip must be de-iced before connecting on probe.
  • Page 15: Service Information And Maintenance

    1. Remove the air vent grill and clean the air filter with compressed air. 2. Stop the BCU05 for a few hours. Switch off and disconnect the unit from probe. Blow dry air through the unit without cooling for ten minutes to remove the moisture from the heat exchanger.
  • Page 16: Bcu05Lt Informations

    BCU05 HR applications BCU05LT informations Technical specifications 1.6.1 This version of BCU05 with a longer heat exchanger (LT= 4m) is used with the largest magnets 750-800 MHz. It has the same technical specifications as the standard BCU05 unit. Identifications of parts 1.6.2...
  • Page 17: Troubleshooting Guide

    BCU05 does not cool correctly The heat exchanger may be clogged with ice: • Switch off the BCU05 unit and wait for a period of 12 hours. • Disconnect the exchanger from the probe. • Put the exchanger on the floor.
  • Page 18 BCU05 HR applications 18 (41) BRUKER BCU05 Version 006...
  • Page 19: Bcu05 Hr-Mas Applications

    ± 1°C under perfectly constant conditions of mains voltage, room temperature, air flow, etc. Operating principle The BCU05 is a cooling unit that reduces the temperature of an air input by typi- cally 65°C. Freon gas is circulating around an external heat exchanger within a completely sealed system.
  • Page 20: Identification Of Parts

    "Mounting the support clamp" on page 10 Installation See Installation BCU05 HR "Installation" on page 10 Put some vacuum grease on glass ball-joint before clamping the heat exchanger. Take care to keep the right distance between the probe glass ball-joint and the support clamp.
  • Page 21: Figure 2.2. Heat Exchanger Support Stand (W4M123713A)

    Installation Figure 2.2. Heat Exchanger support stand (W4M123713A) 2. Position the cooling unit as far as possible from the magnet so as to minimise the effect of the magnet stray field. BCU05 Version 006 BRUKER 21 (41)
  • Page 22: Figure 2.3. Bcu05 Connections (W4M123712A)

    BCU05 HR-MAS applications Figure 2.3. BCU05 connections (W4M123712A) 22 (41) BRUKER BCU05 Version 006...
  • Page 23: Bcu05 Hr To Bcu05 Hr-Mas

    3. Unscrew the HR trump output coupling 4. Screw the HR-MAS coupling 5. Install the pressure switch box 6. Connect the hoses and cables as shown on drawing "BCU05 HR-MAS Con- nection diagram" on page 33 and "BCU05 in operation" on page 35. BCU05 Version 006...
  • Page 24: Bcu05 Hr To Bcu05 Hr-Mas

    BCU05 HR to BCU05 HR-MAS 24 (41) BRUKER BCU05 Version 006...
  • Page 25: Bcu05 Hr-Mas To Bcu05 Hr

    8. Screw the HR coupling 9. Install the pressure switch box 10. Connect the hoses and cables as shown on drawing "BCU in operation (W4M123717A)" on page 30 and "BCU05 with BST Block diagram" on page 28. BCU05 Version 006...
  • Page 26: How To Install A Sense Of Bearing Kit

    2. Install the kit as shown in picture below 3. Connect the hoses and cables as shown on drawing "BCU05 HR-MAS Con- nection diagram" on page 33 and drawing "BCU05 in operation" on page 4. Change the HR coupling with HR-MAS coupling (see chapter "How to change from BCU05HR to HR-MAS"...
  • Page 27: Schematics

    Schematics BCU05 Version 006 BRUKER 27 (41)
  • Page 28: Figure 5.1. Bcu05 With Bst Block Diagram

    BCU05 GAS FLOW BVT 3000 D N2 GAS OR DRIED AIR > - 50C SUPPORT CLAMP EXCHANGER BCU 05 MAINS GLASS BALL JOINT SUPPORT STAND B-CU 05 WITH BST BLOCK DIAGRAM ART NR : DRAWN APPROV MODIFICATION PRT NR : D.J.
  • Page 29: Figure 5.2. Bcu Wiring Diagram

    SWITCH MAIN PLUG SOLID STATE RELAY CONNECTOR BROWN TO BVT 3000/BVT3300 WHITE BCU05 WIRING DIAGRAM ART NR : DRAWN APPROV MODIFICATION PRT NR : DWG NR : W4S22941B 10/92 06/95 DSK NR : W1K20345 BCU05 Version 006 BRUKER 29 (41)
  • Page 30: Figure 5.3. Bcu In Operation (W4M123717A)

    Figure 5.3. BCU in operation (W4M123717A) support stand 30 (41) BRUKER BCU05 Version 006...
  • Page 31: Figure 5.4. Bcu05Lt In Operation On 750/800 Mhz

    BCU05 SUPPORT STAND. SUPPORT STAND. TRIPOD DESS. PAR : DATE : 12/95 BCU05 LT DSK N : ECH : 1/15 N DE PLAN W3M151933 IN OPERATION ON 750/800MHz...
  • Page 32: Figure 5.5. Bcu05 Block Diagram

    BCU CN AIR IN BVT3X00 AIR IN MAIN CONNECTING HOSE MAS REMOTE CONTROL N2 GAS OR DRIED AIR > -50C HEATER BCU05 THERMOCOUPLE HR-MAS MAINS EXCHANGER SPIN RATE SUPPORT CLAMP GLASS BALL JOINT SUPPORT STAND ART: W1210342 DRAWN: VISA: DATE:...
  • Page 34: Figure 5.7. Bcu05 Hr-Mas Wiring Diagram

    Figure 5.7. BCU05 HR-MAS Wiring diagram 75617 HEATER THERMOCOUPLE PRESSURE SW THERMOCOUPLE COMPRESSOR HEATER TERMINAL BOX MAINS BREAKER 2A BLACK BLACK ON/OFF MAIN PLUG OPEN : IF DRIVEN BY BVT 3000 OR 3300 CLOSED : IN STAND ALONE MODE SWITCH...
  • Page 35: Figure 5.8. Bcu05 In Operation

    Figure 5.8. BCU05 in operation BCU05 Version 006 BRUKER 35 (41)
  • Page 36 Schematics 36 (41) BRUKER BCU05 Version 006...
  • Page 37: Figures

    Figure 2.3. BCU05 connections (W4M123712A) ........22 BCU05 HR to BCU05 HR-MAS BCU05 HR-MAS to BCU05 HR Schematics Figure 5.1. BCU05 with BST Block diagram ...........28 Figure 5.2. BCU Wiring diagram ............29 Figure 5.3. BCU in operation (W4M123717A) ........30 Figure 5.4.
  • Page 38 Figures 38 (41) BRUKER BCU05 Version 006...
  • Page 39: Tables

    Tables BCU05 HR applications BCU05 HR-MAS applications BCU05 HR to BCU05 HR-MAS BCU05 HR-MAS to BCU05 HR Schematics BCU05 Version 006 BRUKER 39 (41)
  • Page 40 Tables 40 (41) BRUKER BCU05 Version 006...
  • Page 41 Lastpage BCU05 Version 006 BRUKER 41 (41)

Table of Contents