Performance Checklist

—Verify cabinet size.
— Verify electrical supply and water supply (if applicable).
— Install anti-tip device(s) and verify unit is secure.
— Position unit in cutout, level at desired height and secure unit.
—Plug-in unit and verify operation.
—Connect water supply (if applicable).
• Verify icemaker fi ll tube is properly inserted.
• Verify icemaker bail arm is down.
• Verify dispenser operation (if applicable).
Verify Operations
Control Panel
VRI/FRI/MVRI 7240 / 7300 / 7360
VFI/FFI/MVFI 7240 / 7300 / 7360
VFI/FFI/MVFI7180
—Align/square door(s).
— Verify drain pan is properly installed and there are no leaks on
water connection.
—Install kickplate.
— Remove internal packaging and labels and wipe unit down.