Performance Checklist - Viking VCFB304 Installation Manual

Hide thumbs Also See for VCFB304:
Table of Contents

Advertisement

25
Open door. Display should flash.
Press "ACTIVATE CONTROLS" button pad and close
ote: There is a 6 minute delay before the unit starts.
49
26
door.

Performance Checklist

h Align/square door(s).
h Verify cabinet size.
h Verify drain pan is properly installed and
h Verify electrical supply and water supply
(if applicable).
h Install anti-tip device(s) and verify unit is
h Install kickplate.
secure.
h Remove internal packaging and labels
h Position unit in cutout, level at desired
height, and secure unit.
Installer's information:
h Plug-in unit and verify operation.
h Connect water supply (if applicable).
Installer's Name:
• Verify icemaker fill tube is properly
inserted.
Installer's Company:
• Verify icemaker bailarm is down.
• Verify dispenser operation
Date: ________________________________________
(if applicable).
50
there are no leaks in water connection.
and wipe unit down.
_____________________________
_________________________

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vcrb304Vcrb364Vcfb364

Table of Contents