Appendix E – Installation and Quick Reference
Fuel/Gas Supply
Refer to Section
piping with too much pressure drop will negatively impact the boiler's performance.
Install a lock-up type gas regulator to supply an appropriate gas pressure as described below:
Natural Gas
Minimum Inlet Pressure = 4.0" W.C.
Maximum Inlet Pressure = 14.0" W.C.
Patterson-Kelley recommends installing an individual lock-up type gas
regulator in the gas supply piping to each boiler. For installations where
one master lock-up type gas pressure regulator will service multiple
boilers, Patterson-Kelley recommends contacting the local regulator
representative for application assistance specifying the appropriate lock-
up type regulator and gas pipe sizing.
Electrical/Power Supply
Carefully inspect the boiler's nameplate labels which describe the power supply requirements.
Provide an appropriate power feed to the boiler with overcurrent protection:
Boiler Model
C-1500H
C-2000H
C-2500
C-3000 / C-4000 (240V)
C-3000 / C-4000 (480V)
The C-3000 & C-4000 MUST be ordered to the correct voltage! IT IS NOT POSSIBLE to convert a
C-3000 or C-4000 between the 240V and 480V configurations in the field.
Prior to startup, carefully check all electrical connections for tightness as connections can come
lose during shipping.
Exhaust Venting
The
P-K MACH
boilers are dual-certified as Category II & Category IV appliances, capable of
operating with slightly negative to slightly positive exhaust pressure. It is critical to ensure the
flue venting material is suitable for use with the boiler.
For Category II installations, ensure the flue venting system is designed to maintain a slightly
negative exhaust pressure between -0.01" W.C. and -0.04" W.C.
For Category IV installations, ensure the flue venting system is designed to maintain a slightly
positive exhaust pressure between +0.01" W.C. and +0.22" W.C.
Revised: January 3, 2020
Released: January 3, 2020
3.7
for information on proper sizing of the gas supply piping. Undersized gas
Power Supply Requirements
110-120VAC, single phase, 60Hz sized for 20 Amps.
110-120VAC, single phase, 60Hz sized for 20 Amps.
110-120VAC, single phase, 60Hz sized for 20 Amps.
208-240VAC, three phase, 60Hz sized for 20 Amps.
460-480VAC, three phase, 60Hz sized for 20 Amps.
 Patterson-Kelley 2020
All Rights Reserved.
Technical Service 1.877.728.5351
Propane Gas
Minimum Inlet Pressure = 7.0" W.C.
Maximum Inlet Pressure = 14.0" W.C.
NOTE
NOTE
1004905981 P-K MACH C1500H-C4000 Installation and
®
P-K MACH
Gas Fired Boiler
Owners Manual (Rev F Jan-2020).docx
Page 119

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents