Site Preparation; Initial Inspection Upon Receiving; Storage Prior To Installation - Patterson-Kelley MACH C-1500H Installation & Owner's Manual

Gas fired boilers w/ nuro control system
Table of Contents

Advertisement

Installation and service must be
performed by a qualified
installer, service agency, or gas
supplier. Failure to install the
equipment in accordance with
this manual could result in an
unsafe operating condition.
N
!
OTICE
Controls and other equipment that
are damaged or fail due to
weather exposure are not covered
by warranty.
The wheels provided with this
boiler are for positioning
purposes only. When
positioning this boiler, maintain
positive control of it at all times.
Do not attempt to move the
boiler on surfaces that are not
level. Failure to heed this
warning could result in
personal injury or death.
N
!
OTICE
The boiler may be installed on a
combustible floor; however, the
boiler must never be installed on
carpeting.
Bumping hazard from overhead
ducts! Install all components
with adequate vertical
clearances. Insufficient
clearance can restrict the
service access, increasing the
possibility of injury.
Revised: January 3, 2020
Released: January 3, 2020
2

Site Preparation

Initial Inspection upon Receiving

Upon receiving the boiler, inspect it for signs of shipping
damage. Some damage may be hidden. Unpack the boiler,
open the front and side doors and inspect the boiler. Verify that
the total number of pieces shown on the packing slip agrees
with those actually received.
NOTICE! Note any damage, suspected potential damage,
or shortage of materials on the freight bill and immediately
notify the carrier. File all claims for shortage or damage with
the carrier. Claims for hidden damages must be filed with
your carrier within 7 days. The carton is equipped with a
"Tip (N) Tell". If the "Tip (N) Tell" arrow point is blue, that
indicates the package has been on its side or tipped over in
transit.

Storage Prior to Installation

If the boiler is not installed immediately, it must be stored in a
location adequately protected from the weather, preferably
indoors. If this is not possible, then it should remain in the
shipping container and be covered by a tarpaulin or other
waterproof covering.
NOTICE! Controls and other equipment that are damaged
or fail due to weather exposure are not covered by warranty.
 Patterson-Kelley 2020
All Rights Reserved.
®
P-K MACH
Technical Service 1.877.728.5351
1004905981 P-K MACH C1500H-C4000 Installation and
Owners Manual (Rev F Jan-2020).docx
Gas Fired Boiler
Page 7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents