Applications Of Device Ats022 - ABB ATS022 Installation And Operating Instructions Manual

Automatic transfer switch
Table of Contents

Advertisement

Installation and operating instructions, ATS022

4. Applications of device ATS022

The ATS022 device controls all the switching sequences by applying the time delays that can be set:
Time delays
Description
Opening delay of main line CB after detection of a fault in the
mains (Generator is not in use).
TS Delay
Generator start delay after detection of a fault in the mains
(Generator in use).
TBS Delay
Opening delay of emergency line CB.
TCE Delay
Closing delay of line LN2 CB2.
TCN Delay
Closing delay of CB1 of line LN1.
Opening and closing delay of CB3 if used in Bus Tie
TC Delay
application.
TGOFF Delay
Generator switching off delay after closure of line LN1 CB1.
Delay in activation of outlet DO7, after detection of the fault
TL Delay
on both lines LN1 and LN2.
Table 4.1:
Description of time delays
ATTENTION: it is necessary to take into consideration that the total switching time, in addition to the set
up delay, includes also the internal time of ATS.
4.1 Switching Main Line – Emergency Line (2CBs)
Description
Both lines are normally present; in cause of anomaly on the main line,
ATS022 switches to the emergency line used as the reserve line.
Figure 4.1:
2CBs application layout – generator not in use
1SDH000760R0002
4.
8
Applications of device ATS022
Value
0...30s
0...59s, 1,2,3...30min
0...60s
0...60s
0...60s
0...59s, 1,2,3...30min
0...60s

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents