2. Explanation of abbreviations and terms

2. Explanation of abbreviations and terms

2.1. General information

ATS:
Automatic Transfer Switch; automatic switching device.
ATS022:
ATS of the ATS02x series, version with display and Modbus communication.
CB:
Circuit Breaker; low voltage automatic Circuit Breaker.
CB1:
CB on line LN1.
CB2:
CB on line LN2.
CB3:
CB for Bus Tie, NPL and NPL BUS TIE operating modes.
LN1:
Power supply line No.1.
LN2:
Power supply line No.2.
Bus Tie:
Operating mode with busbar tie circuit breaker.
NPL:
Operating mode with non priority control circuit breaker.
NPL BUS TIE:
Operating mode with non priority control circuit breaker for non priority loads control.
Modbus RTU:
Communication protocol.

2.2. Times

NOTE: All the details of the times and switching logics are described in the Chapters concerned.
TS:
- Opening delay of main line CB, after detection of fault in mains (generator is not in
use).
- Generator start delay, after detection of fault in mains (generator in use).
TCE:
Closing delay of CB2 of line LN2.
TBS:
Opening delay of emergency line CB, after detection of stabilised voltage on main line.
TCN:
Closing delay of CB1 of line LN1.
TGOFF:
Generator switching off delay, after closure of main line CB.
TC:
Delay in opening and closing of CB3 in Bus Tie application.
TL
Delay in activation of outlet DO7, after detection of the fault on both lines LN1 and