ABB ATS022 Installation And Operating Instructions Manual page 12

Automatic transfer switch
Table of Contents

Advertisement

Installation and operating instructions, ATS022
Time diagrams
Line 1 ok
CB1 CLOSED
Gen start
Line 2 ok
CB2 CLOSED
CB3 CLOSED
Figure 4.7:
Application time diagram 3CBs NPL BUS TIE - generator in use
Line 1 ok
CB1 CLOSED
Line 2 ok
CB2 CLOSED
CB3 CLOSED
Figure 4.8:
Application time diagram 3CBs NPL BUS TIE - generator not in use
Special cases: if LN1 returns to normal before LN2, the sequence is interrupted and the generator is
switched off; if LN1 returns to normal during TCE, the sequence is completed. If LN1 disappears during
TBS, the sequence is interrupted; if LN1 disappears during TCN, the switchboard starts TS running in
order to re-enter on LN2. If LN2 disappears during TCE, the procedure is in any case completed. main
line LN1.
1SDH000760R0002
TS
TCE
TS
TCE
12
4.
Applications of device ATS022
TBS
TCN
TGOFF
TBS
TCN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents