Unconverted Factory Trap Configuration; Horizontal Left Trap Configuration - Carrier 59TP6B Installation, Start-Up, Operating And Service And Maintenance Instructions

Two-stage variable speed ecm multipoise condensing gas furnace
Table of Contents

Advertisement

NOTE: Remove knockout in
casing before re-installing the
condensate trap.
Rotate elbow to
9
desired position
and torque clamp
on inlet 15 lb.-in.
Slide relief tube in
stand-offs to adjust
length.
Align trap over middle
and right-hand port on
collector box.
5
If alternate vent position
is required, loosen clamp
on vent elbow inlet.
Remove relief tube
from port on collector
box.

Unconverted Factory Trap Configuration

As Viewed in the Horizontal Left Orientation
Attach condensate
trap with screw to
collector box.

Horizontal Left Trap Configuration

Fig. 11 - - Horizontal Left Configuration
(Appearance may vary)
Remove the screw that secures the
condensate trap to the collector box
and remove trap.
6
7
Route pressure switch tube
8
underneath relief tube and
connect to port on
collector box.
Connect relief tube to relief
port on condensate trap.
15
Remove relief tube from
relief port on condensate
trap.
Remove front pressure
switch tube and discard.
A new tube is shipped in
the Loose Parts bag.
Remove middle and right
plug from collector box.
DO NOT DISCARD.
Install two plugs previously
removed in open ports on
collector box.
Connect relief tube to port
on collector box.
Connect the new pressure switch
tube from Loose Parts bag to port
on front pressure switch.
A11574

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents