Duct Flanges; Removing Bottom Closure Panel (2 Screws); Removing Bottom Closure Panel (4 Screws); Upflow - Carrier 59TP6B Installation, Start-Up, Operating And Service And Maintenance Instructions

Two-stage variable speed ecm multipoise condensing gas furnace
Table of Contents

Advertisement

PERFORATED
DISCHARGE DUCT
FLANGE
SCREWS (2)
Representative drawing only,
some models may vary in appearance.
1
Lay furnace on the back or side
2
Remove the two (2) screws that secure the bottom
closure panel to the furnace casing and remove the
panel
Fig. 23 - - Removing Bottom Closure Panel (2 Screws)

UPFLOW

90°
YES
YES
120°
MIN
NO
Fig. 22 - - Duct Flanges
BOTTOM
CLOSURE
A170123
27
DOWNFLOW
YES
YES
120°
MIN
NO
SCREWS (4)
BOTTOM
PLATE
Representative drawing only,
some models may vary in appearance.
1
Lay furnace on the back or side
2
Remove the four (4) screws that secure the bottom
plate to the furnace casing
3
Remove the bottom closure from the casing
4
Re--install the bottom plate to the furnace casing and
re--install the four (4) screws
Fig. 24 - - Removing Bottom Closure Panel (4 Screws)
HORIZONTAL
90°
YES
YES
120°
MIN
NO
A10493
A170124