Carrier 59TN6A Installation, Start-Up, Operating And Service And Maintenance Instructions
Carrier 59TN6A Installation, Start-Up, Operating And Service And Maintenance Instructions

Carrier 59TN6A Installation, Start-Up, Operating And Service And Maintenance Instructions

Carrier 59tn6a two-stage, variable speed multipoise gas furnace
Table of Contents

Advertisement

Installation, Start-up,
Operating and
Service and Maintenance Instructions
NOTE:
Read
the entire
instruction
manual
before
starting
the
installation.
SAFETY
CONSIDERATIONS
.........................
3
INTRODUCTION
...................................
4
CODES
AND
STANDARDS
...........................
4
ELECTROSTATIC
DISCHARGE
(ESD) PRECAUTIONS
...
4
ACCESSORIES
.....................................
5
LOCATION
........................................
5
AIR FOR COMBUSTION
AND VENTILATION
..........
9
CONDENSATE
TRAP
...............................
12
Upflow
........................................
12
Downflow
.....................................
12
Horizontal
......................................
12
CONDENSATE
DRAIN
.............................
16
INSTALLATION
...................................
19
Upflow
........................................
19
Downflow
.....................................
19
Horizontal
......................................
20
Filter Arrangement
...............................
20
AIR DUCTS
.......................................
27
Ductwork
Acoustical
Treatment
.....................
27
GAS PIPING
......................................
31
ELECTRICAL
CONNECTIONS
.......................
32
115-V
Wiring
...................................
32
J-Box
Installation
................................
33
24-V
Wiring
....................................
33
Accessories
.....................................
33
Alternate
Power Supplies
..........................
34
VENTING
........................................
40
Special
Venting
Requirements
for Installations
in Canada
. 40
Materials
.......................................
41
Venting
Systems
.................................
41
Locating
Vent Termination
.........................
41
Size the Vent and Combustion
Air Pipes ...............
42
Combustion
Air and Vent Piping Insulation
Guidelines
...
42
Configure
the Furnace
............................
43
Installing
the Vent Termination
......................
44
Venting
System
Length
Calculations
.................
48
START-UP,
ADJUSTMENT,
AND
SAFETY
CHECK
......
61
Select Setup Switch
Positions
........................
61
Prime Condensate
Trap
.............................
61
Purge Gas Lines
...................................
61
Adjustments
......................................
62
Check Safety Controls
..............................
64
Checklist
........................................
64
SERVICE
AND MAINTENANCE
PROCEDURES
........
72
Cleaning
Heat Exchangers
...........................
77
SEQUENCE
OF OPERATION
........................
81
PARTS
REPLACEMENT
GUIDE
......................
88
TABLE
Loose Parts Bag Contents
..............................
6
Minimum
Clearances
to Combustible
Materials
.............
6
Minimum
Free Area Required
.........................
11
Minimum
Space Volumes
.............................
11
Filter Size Information
...............................
21
Opening
Dimensions
................................
23
Air Delivery
CFM ...................................
28
Maximum
Capacity
of Pipe
...........................
32
Electrical
Data ......................................
35
Vent Termination
Kit for Direct Vent (2-Pipe)
Systems
......
41
Combustion-Air
Vent Pipe, Fitting 8: Cement Material .......
45
Maximum
Allowable
Exposed
Vent Lengths
Insulation
......
46
Maximum
Equivalent
Vent Length
......................
47
Deductions
from Maximum
Equivalent
Vent Length
........
47
Altitude
Derate Multiplier
for U.S.A .....................
69
Blower
Off Delay Setup Switch
........................
69
Gas Rate
..........................................
69
Orifice Size and Manifold
Pressure
.....................
70
Always
Ask
For
Use of the AHRI Cellified rMMark indicates a
manufacturer's
participation
in the program.
For
verification
of certification
for individual products,
go to www.ahridirectory.org.
ISO9001
Portions
of the text and tables
are reprinted
from NFPA
54/ANSI
Z223.1-2009©,
with
permission
of
National
Fire
Protection
Association,
Quincy,
MA 02269
and American
Gas Association,
Washington
DC 20001.
This reprinted
material
is not the complete
and official
position
of the NFPA
or ANSI
on the referenced
subject,
which is represented
only by the standard
in its entirety.

Advertisement

Table of Contents
loading

Table of Contents