Mitsubishi Electric 800 Series Instruction Manual page 51

Hide thumbs Also See for 800 Series:
Table of Contents

Advertisement

Communication connectors and terminals
Removal and reinstallation of the operation panel
• Loosen the four fixing screws on the operation panel and pull out the operation panel. (These screws cannot be removed.)
• To reinstall the operation panel, align its connector on the back with the PU connector of the inverter, and insert the
operation panel. After confirming that the operation panel is fit securely, tighten the screws in the diagonal order.
(Tightening torque: 0.39 to 0.49 N·m)
2.8.2
Ethernet connector
Ethernet communication specifications
Item
Category
Data transmission speed
Transmission method
Maximum segment length
Number of cascade connection stages
Interface
Number of interfaces available
IP version
Connection cable
Use Ethernet cables compliant with the following standards.
Communication
speed
100 Mbps
Category 5 or higher, (shielded / STP) straight cable
Category 3 or higher, (shielded / STP) straight cable
10 Mbps
Category 3 or higher, (UTP) straight cable
Hub
Use a hub that supports transmission speed of the Ethernet.
50
INSTALLATION AND WIRING
Description
100BASE-TX/10BASE-T
100 Mbps (100BASE-TX) / 10 Mbps (10BASE-T)
Baseband
100 m between the hub and the inverter
Up to 2 (100BASE-TX) / up to 4 (10BASE-T)
RJ-45
1
IPv4
Cable
Connector
Standard
100BASE-TX
RJ-45 connector
10BASE-T

Advertisement

Table of Contents
loading

Table of Contents