Material Loading - Graco Therm-O-Flow Plus Manual

Hide thumbs Also See for Therm-O-Flow Plus:
Table of Contents

Advertisement

NOTE: Before loading material, make sure there is a
minimum overhead clearance of 110" (2.8 m) and all
air regulators are backed off to their full counterclock-
wise position.
1. Turn on the air supply (Fig. 11).
Fig. 11
2. Place the ram UP/DOWN lever (Fig. 12) in the UP
position .
Fig. 12
3. SLOWLY turn the ram UP regulator clockwise until
the ram begins to rise.
12
309180

Material Loading

PH00019
Fig. 13
CAUTION
As the ram rises, carefully observe the heated hose
cables, making sure they do not catch on any com-
ponents. If a cable catches, immediately stop the
ram from raising by putting the RAM
UP – DOWN lever into the down or neutral position
and route the hose cables to prevent damage.
4. When ram is fully raised, install the drum centering
guides, which were shipped separately to prevent
damage.
5. Apply a thin coating of Graco TSL oil to the follow-
er plate drum seals (Fig. 14).
Fig. 14
6. Open material container, remove any packing
material, and inspect material for any contamina-
tion.
PH00022
PH00020

Advertisement

Table of Contents
loading

This manual is also suitable for:

309180e

Table of Contents