Download Print this page

Screen Technics CINEMASNAP XL Instructions

Fixed frame projection screen

Advertisement

Quick Links

INSTRUCTIONS - CINEMASNAP XL FIXED FRAME PROJECTION SCREEN
Thank you for purchasing a Screen Technics Projection Screen, please
ensure that you read the following instructions fully before attempting to
install this product.

STEP 1.
Layout all components ready for assembly as
shown

Note: Box Section Frame will be supplied




STEP 2.
Push the four corners of the frame together.


Due to frame size, you may need to join frame pieces,


you may need to use a plastic or wooden mallet (not


metallic) to achieve this result.












STEP 3.
With the Hex Head Allen-Key screws use the


provided Allen-Key to screw tight all four corners. You


must ensure each of the four corners are square and

there are no large gaps obvious before you start to


insert Hex head Allen-Key screw, otherwise jamming

may occur.




Note: Box Section Frame will be supplied





STEP 4.
Tighten all internal Allen-Key screws (one on


each corner as shown below), before fully tightening



the external screws.


Note: Box Section Frame will be supplied



















Step 5.
AUSTRALIA
22-24 Suttor Road, Moss Vale NSW 2577
+61 2 4869 2100
STEP 4A.
Place corner brackets in each corner of frame
(as shown)
STEP 5.
It is now time to install the L-Shaped brackets and there are two options:
It is now time to install the L-Shaped brackets and there are two options:
Step 5.
It is now time to install the L-Shaped brackets and there are two options
The brackets come supplied with self-tapping (Tek) screws that allow you to drill directly
• The brackets come supplied with self-tapping (Tek) screws that allow you to drill directly
• The brackets come supplied with self-tapping (Tek) screws that allow you to d
into the frame, anywhere that best suits wall stud supports and the like. Later on in the
into the frame, anywhere that best suits wall stud supports and the like. Later on in the
into the frame, anywhere that best suits wall stud supports and the like. Later o
installation you will need enough room to re-screw these Tek screws top and bottom of the
installation you will need enough room to re-screw these Tek screws top and bottom of
installation you will need enough room to re-screw these Tek screws top and b
frame for final fixing.
the frame for final fixing.
the frame for final fixing.
If you don't have enough "elbow" room to get at the top of frame with a power or screw
• If you don't have enough "elbow" room to get at the top of frame with a power or screw
• If you don't have enough "elbow" room to get at the top of frame with a power
driver at this latter time because of a low ceiling then utilize the nylon bushes supplied
driver at this latter time because of a low ceiling then utilize the nylon bushes supplied
driver at this latter time because of a low ceiling then utilize the nylon bushes s
with the small Allen-Key bolt and fix one each to the two top L-Brackets and use the two
with the small Allen-Key bolt and fix one each to the two top L-Brackets and use the two
with the small Allen-Key bolt and fix one each to the two top L-Brackets and us
locating holes on the top of the frame, although this restricts bracket positioning it allows
locating holes on the top of the frame, although this restricts bracket positioning it
locating holes on the top of the frame, although this restricts bracket positionin
you to simply insert the bushes into the holes and then fix the bottom brackets by screws
allows you to simply insert the bushes into the holes and then fix the bottom brackets
allows you to simply insert the bushes into the holes and then fix the bottom b
and your done.
by screws and your done.
by screws and your done.
Larger Wall Brackets supplied with XL version
8 x Larger Wall Brackets supplied with XL version
NEW ZEALAND
44 Mahana Road, Te Rapa, Hamilton
0800 022 821
Step 5.
It is now time to install the L-Shaped brackets an
• The brackets come supplied with self-tapping (Tek) scre
into the frame, anywhere that best suits wall stud suppo
installation you will need enough room to re-screw these
the frame for final fixing.
• If you don't have enough "elbow" room to get at the top
driver at this latter time because of a low ceiling then uti
with the small Allen-Key bolt and fix one each to the two
locating holes on the top of the frame, although this rest
allows you to simply insert the bushes into the holes and
by screws and your done.
8 x Larger Wall Brackets supplied with XL version
8 x Larger Wall Brackets supplied with X
info@screentechnics.com.au
screentechnics.com.au
ESTABLISHED IN 1990
1
3
Continued Over.../

Advertisement

loading

Summary of Contents for Screen Technics CINEMASNAP XL

  • Page 1 INSTRUCTIONS - CINEMASNAP XL FIXED FRAME PROJECTION SCREEN STEP 4A. Place corner brackets in each corner of frame Thank you for purchasing a Screen Technics Projection Screen, please (as shown) ensure that you read the following instructions fully before attempting to install this product.
  • Page 2       INSTRUCTIONS - CINEMASNAP XL FIXED FRAME PROJECTION SCREEN           PREPARE SCREEN SURFACE  STEP 6. Attach brackets as shown – Utilizing nylon Please do not allow the steel rods to come into contact with the screen surface viewing area as it ...
  • Page 3 INSTRUCTIONS - CINEMASNAP XL FIXED FRAME PROJECTION SCREEN Example of Horizontal Spreader Bar Mounting xample of Horizontal Spreader Bar Mounting Example of Horizontal Spreader Bar Mounting STEP 13. Attach the screen to the brackets on wall – Wipe down screen frame of any fingerprints and dust off the screen surface.