Download Print this page

Screen Technics CINEMATECH Instructions

Chain drive projection screen

Advertisement

Quick Links

screen
NEMAPRO Hanging Type Projection Screen
INSTRUCTIONS - CINEMATECH
you for purchasing a Screen Technics Projection Screen, please ensure that you read the following
tions fully before attempting to install this product.
NEMAPRO Hanging Type Projection Screen
Thank you for purchasing a Screen Technics Projection Screen, please
ensure that you read the following instructions fully before attempting to
you for purchasing a Screen Technics Projection Screen, please ensure that you read the following
install this product.
tions fully before attempting to install this product.
l.
Measure the wall where the screen is to be installed and mark with a pencil the desired height to
top of screen case and also the centre of the screen.
WALL MOUNTING INSTRUCTIONS
l.
Measure the wall where the screen is to be installed and mark with a pencil the desired height to
STEP 1.
Measure the wall where the screen is to be installed and mark with a pencil the desired
top of screen case and also the centre of the screen.
height to top of screen case and also the centre of the screen.
2.
Measure the length of screen canister along the top surface and mark the centre of the canister
with a pencil, to assist in lining up the screen when mounting.
STEP 2.
Measure the length of screen canister along the top surface and mark the centre of the
2.
Measure the length of screen canister along the top surface and mark the centre of the canister
canister with a pencil, to assist in lining up the screen when mounting.
with a pencil, to assist in lining up the screen when mounting.
3.
Determine the best positions for the wall brackets, allowing that in Gyprock or in low strength walls
the brackets will be screwed into a timber stud. In more solid walls, such as masonry, position the
brackets approx 150mm in from the canister end. The brackets should be no more than 450mm in
..
,.
-
Chain Drive Projection Screen
Wall Mounting Instructions
Wall Mounting Instructions
AUSTRALIA
22-24 Suttor Road, Moss Vale NSW 2577
+61 2 4869 2100
TECHnlCS
STEP 3.
Determine the best positions for the wall brackets, allowing that in Gyprock or in low
strength walls the brackets will be screwed into a timber stud. In more solid walls, such as
masonry, position the brackets approx 150mm in from the canister end. The brackets should
be no more than 450mm in from each end. You must use a minimum of 3 off wood screws per
bracket or 2 off Dyna-bolts, for masonry walls and you must be satisfied that the attachment is
strong enough for the a safe installation.
NB: Top of bracket equals top of screen canister.
Please note: The CinemaTech screen comes standard with 300mm top black leader above the image
area to assist in mounting the canister high out of the way, to achieve the best possible lay-flat
results (flat surface quality) you should utilise all of the leader.
It is possible to use less leader than supplied but poorer lay-flat will result from this decision.
STEP 4.
You may need to remove the bottom clip in order to screw brackets to wall, please
ensure to replace them afterwards.
STEP 5.
Using two people install the screen by placing the screen canister into the bottom of
the bracket clips and pivoting back the canister to slot the top pins into the T channels running
along the top of the canister (you may have to remove any tape that is in the way).
NEW ZEALAND
44 Mahana Road, Te Rapa, Hamilton
info@screentechnics.com.au
0800 022 821
screentechnics.com.au
1
Continued Over.../
ESTABLISHED IN 1990

Advertisement

loading
Need help?

Need help?

Do you have a question about the CINEMATECH and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Screen Technics CINEMATECH

  • Page 1 NB: Top of bracket equals top of screen canister. Please note: The CinemaTech screen comes standard with 300mm top black leader above the image Measure the length of screen canister along the top surface and mark the centre of the canister area to assist in mounting the canister high out of the way, to achieve the best possible lay-flat with a pencil, to assist in lining up the screen when mounting.
  • Page 2 Note: due to legislative changes the Should you have any questions regarding the installation of our projection screens please call CinemaTech is now supplied with a wall cleat our technical sales desk on +61 2 4869 2100 for assistance. so that when the screen is not in use the...