Installation - Bunn BUNNESPRESS ES2C Operating & Service Manual

Espresso brewer
Table of Contents

Advertisement

BUNN Espress
PLUMBING
Install the brewer as indicated below
FROM
WATER
SUPPLY
From Water Treatment
ELECTRICAL
CAUTION-The brewer must be disconnected from the power source until specified. Improper electrical
installation will damage electronic components.
1. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
2. When instructed to proceed, connect the brewer to the power source.
CAUTION-The brewer must be properly grounded. A plumbing line will not provide an adequate ground.
INITIAL FILL & HEAT
CAUTION-The brewer must be disconnected from the power source until specified. Improper electrical
installation will damage electronic components. Plumbing must be connected to the brewer before
proceeding.
1. Watch the tank water level gage and push the tank/boiler manual fill button. Hold the button until the water
level is visible in the sight gage.
2. Connect the brewer to the power source.
3. Place the main power switch in the "ON" position. The automatic refill function of the electronic control
system will engage at this time. The refill indicator will glow and the tank will automatically fill with water.
This switch also initiates the heating of the water in the tank/boiler.
4. Press the continuous flow button on each of the group control panels just until water flows from the group
heads. This will purge air from the lines and allow faster heating of the group heads.

INSTALLATION

®
WATER STRAINER
ASSY.
24682.0000
Adaptor
24684.0000
Sealing Washer
INLET HOSE
24684.0000
23820.0000
Sealing Washer
Strainer Assy.
5
ES•2C
24683.0000
Adapter
To Espresso Brewer
Inlet Hose

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Espress es-2c

Table of Contents

Save PDF