Required Parts; Required Tools - LG MULTI V ARNU07GTUA4 Engineering Product Data Book

Hide thumbs Also See for MULTI V ARNU07GTUA4:
Table of Contents

Advertisement

Indoor unit
10. Installation
• Please read this instruction sheet completely before installing the product.
• When the power cord is damaged, replacement work shall be performed by authorized personnel only.
• Installation work must be performed in accordance with the national wiring standards by authorized personnel only.
Installation Parts Provided
1. Installation Plate
2. Type "A" screws
3. Type "B" screws

Required Parts

o Installation plate
o Five type "A" screws
o Two type "B" screws
o Connecting cable
o Pipes: Gas side
Liquid side
o Insulation materials
o Additional drain pipe

Required Tools

o Level gauge
o Screw driver
o Electric drill
o Hole core drill
o Flaring tool set
o Specified torque wrenches
o Spanner......................................................Half union
o A glass of water
o Screw driver
o Thermometer
ARTCOOL (Mirror)
_ 23

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Multi v arnu09gtua4Multi v arnu12gtua4Multi v arnu18gtta4Multi v arnu24gtta4Multi v arnu09gtla4Multi v arnu12gtla4 ... Show all

Table of Contents