Overview and connection diagrams for connecting the drive to the fieldbus are shown below.
X5
Termination OFF
Bias OFF
Drive
Drive control
unit
Connect the cable shields together at each drive, but do not connect them to the drive.
Connect the shield only to terminal "G" (ground) in the automation controller.
Connect the DGND conductor to terminal "R" (reference) in the automation controller.
13. Install optional modules, if included in the delivery
14. Install the cover(s)
The cover installation procedure is the opposite of the removal procedure. Refer to
install the side plates shown in
15. Start up the drive
WARNING! Before you start up the drive, make sure that the installation is completed. Make sure also that it is safe
to start the motor. Disconnect the motor from other machinery if there is a risk of damage or injury.
Use the control panel to do the start-up procedure. The two commands at the bottom of the display show the functions of
the two softkeys
and
depending on the context. Use the arrow keys
active view. Key
shows a context-sensitive help page.
?
1.
Power up the drive. Make sure that you have the motor name plate data available.
2.
The First start assistant guides you through the first start-up.
The assistant begins automatically. Wait until the control panel shows
the language selection screen.
Select the language you want to use and press
Note: After you select the language, it takes a few minutes for the
control panel to wake up.
3.
Select Start set-up and press
X5
Termination OFF
Bias OFF
Drive
X1
X5
1
29
30 31
Connection procedure
before you install the cover.
located below the display. The commands assigned to the softkeys are different
,
,
(Next).
Fieldbus controller
1)
Termination ON
Fieldbus
X5
Termination ON
2)
Bias ON
Drive
Automation controller
Remove the cover(s)
and
to move the cursor or change values depending on the
(OK).
1) The devices at both ends
on the fieldbus must have
termination set to ON.
2) One device, preferably at
the end on the fieldbus,
must have bias set to ON.