Operation - Breckwell BIG E Owner's Manual

Hide thumbs Also See for BIG E:
Table of Contents

Advertisement

SPECIAL MOBILE HOME REQUIREMENTS
WARNING: DO NOT INSTALL IN A SLEEPING ROOM.
NOTE: Installation should be in accordance with the Manufactured Home and Safety Standard (HUD), CFR 3200,
Part 24
For installation in a mobile home, an outside source of combustion air must be used. (See "COMBUSTION AIR
SUPPLY").
The Breckwell Big E must be grounded to the steel chassis of the with 8 Ga. copper wire using a serrated or star
washer to penetrate paint or protection coating to ensure grounding.
The Breckwell Big E must be securely fastened to the floor of the mobile home through the two holes in the rear
of the stove using 2 1/4" lag bolts that are long enough to go through both a hearth pad, if used, and the floor
of the home. (See figure11)
Refer to "VENTING" for proper exhaust configurations.
CAUTION: THE STRUCTURAL INTEGRITY OF THE MANUFACTURED HOME FLOOR, WALL, AND CEILING/ROOF MUST
BE MAINTAINED.
When installing in a mobile home ensure that the vapor barrier at the location where the chimney or other
component penetrates to the exterior of the structure.
Never operate with the firing doors open.
A smoke detector should be installed in the room where the heater is installed. The smoke detector should be
installed at least 10 feet away from the heater to prevent accidentally setting the detector off.
Bolt Hole

Operation

FIGURE 11
Bolt Hole
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sp1000

Table of Contents