Nx-7500 Series Integrated Services Platform Nmc Installation - Extreme Networks ExtremeWireless NX-7500 Series Installation Manual

Integrated services platform
Table of Contents

Advertisement

3 Unpack the AC or DC power supply module and carefully insert it into the NX-7500 integrated
services platform.
4 Press the locking latch to lock the power supply in place.
5 Observe that the power supply light is illuminated to verify that the power supply is operating
properly.
Installing an Additional Power Supply for NX-7510 or NX-7530 Integrated
Services Platform
To install an additional power supply for an NX-7510 or NX-7530 integrated services platform:
1
Unpack the AC or DC power supply module and carefully insert it into the NX-7510 or NX-7530
integrated services platform.
2 When installing a second power supply in an NX-7510 or NX-7530 integrated services platform,
remove the blank cover from the back.
3 Press the locking latch to lock the power supply in place.
4 Plug the power cord into the power supply.
5 Observe that the power supply light is illuminated to verify that the power supply is operating
properly.
Note
When two power supplies are installed, both power supplies should be properly connected
to a power source and powered up. An audible beep and display of a red LED indicates
that a power supply is not properly connected to a power source.

NX-7500 Series Integrated Services Platform NMC Installation

Warning
Power down the integrated services platform and disconnect all power cords prior to
installing or replacing the Network Mezzanine Card (NMC).
NX-7500 Series Integrated Services Platform
Hardware Installation
13

Advertisement

Table of Contents
loading

Table of Contents