Nx-7510/Nx-7520/Nx-7530 Series Slide Rail Kit Installation Instructions - Extreme Networks ExtremeWireless NX-7500 Series Installation Manual

Integrated services platform
Table of Contents

Advertisement

3 Pull the hard drive handle to the left and remove the hard drive from the drive bay.
4 Firmly insert the new disc drive assembly into the drive bay.
5 Push on the disc drive assembly until the lever locks in place.
6 Apply power to the integrated services platform.
When the new disc drive assembly is properly installed, the system rebuild will launch automatically.
This process may take up to two hours. To monitor the progress of the system rebuild, login to the
Command Line Interface (CLI) and enter the show raid command to display the current status.
NX-7510/NX-7520/NX-7530 Series Slide Rail Kit Installation
Instructions
Follow this procedure to install the slide rail for an NX-7500 series platform:
1
Using a Phillips head screwdriver, remove the mounting bracket screws from both sides of unit.
Note
Put the screws aside to be used when attaching the brackets for the slide rail.
NX-7500 Series Integrated Services Platform
Hardware Installation
16

Advertisement

Table of Contents
loading

Table of Contents