Intel SRPL8 Quick Start Manual page 14

Server system
Hide thumbs Also See for SRPL8:
Table of Contents

Advertisement

Cord length and flexibility: Cords must be less than 4.5 meters (14.76 feet) long, and must
be flexible (harmonized
certifications.
NOTES
Surge suppressor recommended: In geographic regions that are
susceptible to electrical storms, we highly recommend that you plug the
server into a surge suppressor.
Install power cord with or without retention mechanism: On the interior
chassis wall beneath the external power connector, three hexagonal pegs
form a retention mechanism. When you route the power cord between the
hexagonal pegs, the cord cannot be pulled accidentally from the back of the
server. We recommend you use the retention mechanism, but you do not
NEED to. To access the retention mechanism, remove the left power supply
(see Chapter 4 in the server Product Guide).
For EMI information, see the Product Guide: For information about
complying with electromagnetic interference regulations, see
"Electromagnetic Compatibility" in the server Product Guide.
To view or print the Product Guide: See "The Server Product Guide" on
page 20 in this Quick Start Guide.
14 Quick Start Guide
<
>
HAR
) cord or VDE-certified cordage to comply with server's safety

Advertisement

Table of Contents
loading

Table of Contents